Project Overview
High- and medium-voltage cable testing at an IPP substation — VLF withstand and sheath integrity testing on MV cabling and ring main units, verified and documented before energisation.
Scope of Work
Very-low-frequency (VLF) and cable sheath testing on medium-voltage cabling and ring main units, with documented pass/fail verification prior to energisation.
Equipment & Technology
- VLF test set
- Cable sheath test equipment
Testing & Commissioning
VLF withstand testing and cable sheath integrity testing with documented results.